On an older house in Scottsdale, the answer to almost every kitchen electrical question changes once the walls are open, and the reasoning listed at scottsdale kitchen remodeling lista stofan starts from the load, not the layout. A remodeling job in Scottsdale, AZ almost always means new circuits.
Dedicated circuits for the big loads

A dishwasher, a disposal, a microwave and a refrigerator each belong on their own circuit, and an electric range needs a heavy cable run to its own breaker. Two small appliance circuits feed the counter outlets. Older kitchens often share one circuit among half of these, which is why a toaster and a coffee maker trip the breaker together.
Outlet spacing and protection

Counter outlets are required so no point along the wall is more than a short reach from one, and an island needs a receptacle of its own. Every counter outlet gets ground fault protection, and the code in Maricopa County and the city of Scottsdale follows the national electrical code with local amendments. The plans should show every outlet before the drywall goes up.
A lighting plan with layers
Recessed cans in the ceiling give general light, and strips under the upper cabinets light the counter where the work happens. A pendant over a peninsula adds a third layer. Switch each layer separately and put dimmers on the ones people use at night. Plan the cans around the cabinet run and the joists, not on a grid that ignores both.
Where the range hood vents
A hood that recirculates air does little for grease and heat. A ducted hood runs smooth metal duct to the outside, either through the roof or straight through an exterior wall. In a house with a low pitched roof in Scottsdale, AZ, under the Sonoran Desert sun the roof route needs a flashed jack and a damper, and the duct should be as short as the framing allows with as few elbows as possible.
Makeup air and the climate
A strong hood pulls air out, and that air has to come from somewhere. In a tight, air conditioned house that can draw combustion gases back down a water heater flue. A makeup air damper solves it, and the inspector will often ask about it for large hoods. The summer heat in the Sonoran Desert makes a leaky duct run through the attic especially costly.
Permit and inspection steps
Electrical and mechanical work in the Phoenix metropolitan area needs a permit, and homes near the McDowell Mountains fall under the same city inspectors. The inspector comes at rough-in, with walls still open, then again at final. Keep the permit card visible on the site and do not close a wall until the rough-in has been signed off. Failing an inspection costs days.